Introduction 

One of the biggest concerns businesses can have when considering warehouse automation is disruption. 

Installing new conveyors, robotics, pallet exchanging machines or other automated equipment sounds useful in the long term, but what happens while the work is actually taking place? 

Can orders still be processed? Can employees continue working? Does part of the warehouse need to close? And, most importantly, does the entire operation need to stop? 

In many cases, warehouse automation can be introduced without completely shutting down the operation. 

Projects within existing warehouses can often be planned in phases, with installation taking place around live operations and disruption limited to particular areas or agreed periods. 

However, this requires careful planning. 

The best approach will depend on the automation being installed, the existing warehouse layout and how much flexibility the operation has while the work takes place. 

Why Is Installing Automation in a Live Warehouse More Complicated? 

Installing automation in an empty building is very different from working inside an operational warehouse. 

In a live environment, normal activity may still include: 

  • Employees moving around the site 
  • Forklift traffic 
  • Goods arriving 
  • Orders being picked 
  • Products being packed 
  • Vehicles being loaded and unloaded 
  • Existing machinery operating 
  • Customers expecting orders to arrive as normal 

The automation project therefore has to fit around an existing operation rather than starting with an empty space. 

This is sometimes referred to as a brownfield automation project. 

Brownfield automation involves introducing or upgrading automation within an existing facility, whereas a greenfield project generally starts with a new site where the layout and infrastructure can be designed around the automation from the beginning. 

Many businesses considering automation are dealing with a brownfield environment. 

Does a Warehouse Need to Close During Automation Installation? 

Not necessarily. 

Whether operations need to stop depends on the scale and location of the project. 

Installing a relatively standalone piece of equipment in one area may have little effect on the rest of the warehouse. 

A larger project involving conveyors, storage systems, robotics, electrical work and several interconnected processes may require more careful coordination. 

There may also be individual stages where a particular area needs to stop temporarily. 

The important distinction is between local disruption and a complete warehouse shutdown. 

An installation might require one conveyor route, loading area or section of the warehouse to become temporarily unavailable without preventing the rest of the operation from continuing. 

Planning these periods in advance can make a significant difference to the impact of the project. 

What Is a Phased Warehouse Automation Installation? 

Rather than installing an entire automation system at once, a project can sometimes be divided into smaller stages. 

For example, a business might automate one area before moving on to another. 

A phased project could involve: 

  1. Preparing the installation area 
  1. Installing the first section of equipment 
  1. Testing and commissioning that section 
  1. Bringing it into operation 
  1. Moving on to the next stage 

This can reduce the amount of the warehouse affected at any one time. 

It can also allow employees to become familiar with the new equipment gradually rather than changing several processes simultaneously. 

Not every system can be separated neatly into independent phases, but where it is possible, phased installation can be a useful way of managing disruption. 

Can Installation Take Place Outside Normal Operating Hours? 

Sometimes. 

Depending on the business, certain installation activities may be scheduled around quieter periods. 

This could include: 

  • Evenings 
  • Weekends 
  • Planned shutdown periods 
  • Quieter shifts 
  • Seasonal low points 

For a warehouse operating five days a week, for example, some work may be completed over a weekend before normal activity resumes. 

A 24-hour operation has less downtime available, so the project may need to rely more heavily on phased installation and temporary operational changes. 

Working outside normal hours is not automatically possible or appropriate for every project, but installation windows should be discussed early in the planning process. 

Can Equipment Be Prepared Before It Arrives on Site? 

Yes, and this can help reduce the amount of work required inside the customer’s warehouse. 

Depending on the system, equipment can sometimes be assembled, configured or tested away from the live site before installation. 

This might include preparing: 

  • Conveyor sections 
  • Control panels 
  • Electrical components 
  • Software 
  • Robotic systems 
  • Mechanical assemblies 

The more that can be completed before equipment arrives, the less work may be required within the operational environment. 

It can also provide an opportunity to identify certain issues before the installation team is working within a limited site window. 

This is one reason preparation can be just as important as the installation itself. 

How Can Existing Conveyor Systems Be Upgraded Without Stopping Everything? 

Conveyor projects provide a good example of how automation can be introduced into an existing operation. 

A business may already have conveyors that need to be extended, replaced or connected to new equipment. 

Rather than replacing an entire conveyor system at once, it may be possible to work on individual sections. 

Temporary processes may be used while one route is unavailable, or the installation may be scheduled for a period when that part of the warehouse is less busy. 

The exact approach depends on how important the conveyor is to the wider operation. 

If one conveyor carries every outbound order, replacing it will require considerably more planning than modifying a secondary route. 

Understanding which equipment is operationally critical is therefore an important part of project planning. 

Are Mobile Robots Easier to Introduce Into an Existing Warehouse? 

Autonomous mobile robots can offer advantages in brownfield environments because they do not necessarily require the same amount of fixed infrastructure as some traditional forms of automation. 

AMRs can use onboard navigation technology to move through suitable existing warehouse environments. 

This means introducing robotics may not require installing a fixed conveyor route or making major physical changes throughout the facility. 

However, AMRs still require planning. 

The project may need to consider: 

  • Robot travel routes 
  • Pedestrian movement 
  • Forklift traffic 
  • Collection and delivery points 
  • Charging locations 
  • Network coverage 
  • Integration with other systems 
  • Safety requirements 

So while mobile robotics can provide flexibility, it should not be viewed as automation that can simply be placed into a warehouse without preparation. 

What About Installing Automation Around Employees? 

People are an important part of any live warehouse installation. 

Installation teams and warehouse employees may need to use the same facility, which means working areas must be carefully controlled. 

Depending on the project, this can involve: 

  • Segregating installation areas 
  • Creating alternative pedestrian routes 
  • Changing vehicle routes 
  • Temporarily relocating workstations 
  • Clearly communicating unavailable areas 
  • Coordinating contractors and warehouse teams 

Safety requirements should determine how the work is organised. 

Keeping the warehouse operational does not mean employees should simply continue working around an unrestricted installation site. 

Some areas may need to be temporarily isolated even if the wider warehouse remains operational. 

Can Temporary Processes Keep Products Moving? 

In some projects, businesses may need to change the way products move temporarily while new automation is being installed. 

For example, products might use an alternative route while a conveyor section is unavailable. 

A process that will eventually be automated might temporarily return to manual handling. 

Goods may also be staged in a different area while work takes place. 

These temporary processes are not necessarily the most efficient way of operating, but they can help maintain business continuity during a limited installation period. 

The key is to plan them before the existing process is taken offline. 

When Might Some Downtime Be Unavoidable? 

Although a complete warehouse shutdown can often be avoided, it would be unrealistic to suggest that automation can always be installed with no downtime whatsoever. 

Some work may require existing equipment to be disconnected before new equipment can be connected. 

Electrical systems may need to be isolated. 

A critical conveyor may need to stop while a replacement section is installed. 

Software integration or commissioning may also require a controlled period where normal operation is restricted. 

The objective should therefore not always be zero downtime. 

A better objective may be to identify necessary downtime in advance and reduce its impact as much as reasonably possible. 

A planned two-hour interruption, for example, is very different operationally from an unexpected system outage. 

Why Is Testing Important Before Normal Operations Resume? 

Once automation has been physically installed, it still needs to be tested. 

This is particularly important when new equipment has been connected to existing systems. 

Testing may include checking: 

  • Product movement 
  • Sensors 
  • Conveyor controls 
  • Robot routes 
  • Safety systems 
  • Emergency stops 
  • Transfer points 
  • Communication between equipment 
  • Different product types 
  • Normal operating sequences 

The system should not be rushed into full production simply to reduce the apparent installation time. 

Allowing sufficient time for commissioning can help identify adjustments before the equipment becomes responsible for normal operational volumes. 

What Information Helps Plan a Live Warehouse Installation? 

The earlier operational constraints are discussed, the easier they are to design around. 

Businesses should tell their automation supplier about factors such as: 

  • Operating hours 
  • Shift patterns 
  • Peak periods 
  • Critical processes 
  • Existing equipment 
  • Vehicle movements 
  • Areas that cannot be taken offline 
  • Planned shutdown periods 
  • Seasonal demand 
  • Site access 
  • Other contractors working on site 

It is particularly important to identify processes where even a short interruption would create significant problems. 

This information can influence both the automation design and the installation plan. 

Should You Wait for a Quiet Period Before Automating? 

A quieter period can make installation easier, but waiting is not always necessary. 

For businesses with clear seasonal patterns, scheduling major work outside the busiest period can be sensible. 

However, some warehouses operate at consistently high volumes throughout the year. 

Others may be considering automation specifically because their existing process is already struggling to cope. 

In these situations, waiting for a completely quiet period may not be realistic. 

Instead, the focus should be on finding a practical installation strategy that allows the project to progress while maintaining essential operations. 

Can Automation Be Expanded Gradually? 

Yes, and this can be particularly useful for businesses that want to automate an existing warehouse without making one large change. 

A company might begin by automating a specific bottleneck or repetitive process. 

Once that system is established, further automation can be introduced elsewhere. 

For example, a warehouse might initially introduce a conveyor system within one process before later connecting it to additional equipment. 

Alternatively, mobile robots could be introduced for one transport route before the fleet or number of applications is expanded. 

This allows automation to develop alongside the operation rather than requiring the warehouse to transform all at once. 

How Do You Reduce Disruption During a Warehouse Automation Project? 

There is no single method, but several principles can help. 

Good projects generally involve: 

  • Understanding the live operation before installation begins 
  • Identifying critical processes 
  • Agreeing installation windows 
  • Completing preparation in advance 
  • Dividing work into phases where appropriate 
  • Creating temporary processes where necessary 
  • Coordinating warehouse teams and contractors 
  • Allowing sufficient time for testing 
  • Communicating changes clearly 

Most importantly, disruption should be considered during the design stage rather than immediately before installation. 

A system that is easy to install within a live warehouse may sometimes require a different project approach from one being installed into an empty facility. 

Conclusion 

Yes, it is often possible to introduce warehouse automation without completely stopping operations. 

Existing warehouses can use phased installation, carefully planned work areas, quieter installation windows and temporary processes to keep essential activity moving while new equipment is introduced. 

Technologies such as conveyors, mobile robots, pallet exchanging machines and other automation can also be implemented gradually rather than requiring the entire warehouse to change at once. 

However, keeping a warehouse operational does not necessarily mean there will be no disruption at all. Certain areas or processes may need to stop temporarily for installation, electrical work, integration or testing. 

The important thing is that these interruptions are understood and planned in advance. 

If you’re considering automating an existing warehouse and are concerned about how installation could affect day-to-day operations, feel free to contact the team. You can also explore more articles across the Knowledge Hub for practical guidance on planning, installing and expanding warehouse automation.